ADIC DLT 7000 Dokumentacja Strona 21

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 46
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 20
Installation 11
Installing in the Rack
Perform the following procedure to install your T5 Enclosure in a standard 19" rack:
1. Remove the hardware components from the accessories bag.
2. Verify that the following components are included:
Quantity Component
10 Captive nut (cage nut), 10-32, slip-on
10 Captive nut (cage nut), 10-32, snap-in
12 Screw, Phillips, 10-32 x ½”
12 Washer, flat, # 10
12 Washer, lock, # 10
3. Locate the left- and right-side rack mount support brackets.
The rack mount support brackets are secured to your racks rear vertical rails with four 10-32 x ½” Phillips
screws and 10-32 cage nuts.
4. Install two cage nuts in each of the racks rear vertical rails (as shown below) by either snapping them
into, or slipping them into the holes in each rail. The cage nuts need to be vertically spaced to secure
each support bracket using a lower and an upper mounting slot.
Front of Rack
Rear Vertical Rails
Przeglądanie stron 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 45 46

Komentarze do niniejszej Instrukcji

Brak uwag